References

References
Atlanta Hotel International Leipzig

At Atlanta Hotel International Leipzig every detail had to be perfected.
Attention to clients requests, accurate drawings preparation and all production and installation process coordination is our key to success.
We have produced and installed furniture to Lobby, Reception and Bar areas.
Non standard decisions have been made to prepare acoustic wall. If needed it will divide dining area but it is also easily folded and maintained.
Skaityti daugiau


References
MONA Restaurant

MONA Restaurant,

Renovation of the MONA restaurant.

Preparation and replaning of the restaurant space according to the submitted design. Preparation works were done for ceiling and wall painting. The ceiling is painted with acoustic paint to absorb sound and noise and insulate it as good as possible. The floor of the restaurant was prepared for tile laying, according to the created design, all the floors of the restaurant were mosaic glued with decorative brass strips Skaityti daugiau


References
Riviera Marriott Hotel La Porte de Monaco

In Riviera Marriott Hotel La Porte de Monaco wall and floor renovations are being done. Old wallpaper is removed from the walls. Walls are being glazed, primed and painted. New laminate is being laid on the floor. Door renovation works are also Skaityti daugiau


References
Azimut Hotel Vienna

The Azimut Hotel Vienna is undergoing renovation works of lobby. The lobby is undergoing floor leveling, new tile installation, plasterboard installation, ceiling preparation works. Walls, columns and ceilings are painted, new switches, sockets and luminaires are installed, old curtains are replaced with new ones. Also, sofas are covered with new fabric, new tables and chairs are Skaityti daugiau


References
Munich Marriott Hotel

Munich Marriott Hotel is undergoing bathroom renovation works. Old tiles are removed from walls and floors, walls and floors are renovated, prepared. New tiles are being glued, new shower trays are installed, skirtings are Skaityti daugiau


References
Mama Shelter Prague

Veletrzni 1502/20, Prague, 170 00, Czech Skaityti daugiau




References
AZIMUT Hotel Kurfuerstendamm Berlin

MOCK UP rooms complete!!!! All full supply and installation of furniture, tiles and bathroom accesories, plumbing, carpets and new wallpapered drywalls, curtains, lights and electric installation, air conditioning solution and new certified wooden windows, is complete.
Starting to inspect the hotel completely for the whole refurbishment in the near future.

Wish us good luck :)
Skaityti daugiau


References
Leonardo Hotel Amsterdam City Center

 Tesselschadestraat 23, 1054 ET Amsterdam, Skaityti daugiau






Courtyard by Marriott Hamburg Airport Hotel

The Courtyard by Marriott Hamburg Airport Hotel's guest rooms undergoes floor renovation works. The floors are primed and matched with a 3mm leveling compound. PVC flooring is laid on the Skaityti daugiau


References
Hotel Novotel Brussels City Centre

Hotel Novotel Brussels City Centre guest rooms are undergoing renovation. The old carpet is removed, the floors are leveled and prepared. New carpet is fitted. Skirtings are being Skaityti daugiau


References
Ibis Brussels off Grand Place

Ibis Brussels off Grand Place guest rooms are undergoing renovation. The old carpet is removed, the floors are leveled and prepared. New carpet is Skaityti daugiau


References
Holiday Inn Berlin - Centre Alexanderplatz

The Holiday Inn Berlin - Center Alexanderplatz is undergoing renovation works in lobby, bguest rooms, and bathrooms. In the lobby, the furniture is changed, chairs are renovated, walls are prepared and renovated. Bedroom rooms are undergoing renovation of door frames, new hooks instalation, renovation of old cabinets, changing of old cabinet doors, tables, beds and curtains. Also rooms are undergoing removal of old laminate, floors are prepared for PVC floring. In the bathrooms, the tile Skaityti daugiau



References
Le Meridien Grand Hotel Nurnberg

5 phases refurbishment project, total 192 bedrooms and all coridors. Reinstalling completely new drywall ceilling with a new light concept.

Repainting the walls and fitting new Brintons carpet, stuck down on the rubber underlay. Tiling marbel in the bathrooms, installing new electric heaters.
Supplying part of new furniture in the rooms and changing all carpet skirting into the MDF skirting. Reinstalling electric in the mounted furniture.
Skaityti daugiau


References
Hilton Frankfurt City Centre

Main Restaurant and breakfast area refurbishment c.a. 500 m2 . Expanding the whole space of the restaurant by joining park room to the main area.  Preaparing and tiling framed islands for the specificated breakfast furniture and buffet. Repairing and repainting 5 m hight ceilling and collumns. Repainting 100 sqm wooden interior accessories. Fitting carpet on the underlay in the gaps between tiled islands.
Appart this, we have joint the refurbishment of the staff offices, Skaityti daugiau


References
Leonardo Hotel Edinburgh City Centre (Haymarket)

 1 Morrison Link, Edinburgh EH3 8DN, United Kingdom
Skaityti daugiau


References
Hotel Fusion Praha

Panska 1308/9, 110 00 Prague, Czech Skaityti daugiau











References
Reformatai Park Hotel Vilnius

 Basanavičiaus g. 9, Senamiestis, LT-01102 Vilnius, Skaityti daugiau




References
Radisson RED Hotel Brussels

 Rue d'Idalie 35, Elsene / Ixelles, 1050 Briusselis, Skaityti daugiau







References
Hilton Munich Park Hotel

Changing new Axminster carpet, double stick on the 6mm rubber underlay. All the round and square shapes on the tile and wood edges were stuck Skaityti daugiau